D2910Re-cement or Re-bond Inlay, Onlay, Veneer or Partial Coverage Restoration
2026 Billing Guide
Covers the fabrication and cementation of a re-cement or re-bond inlay, onlay, veneer or partial coverage restoration to restore a tooth with moderate damage.
What This Code Covers
D2910 covers re-cement or re-bond inlay, onlay, veneer or partial coverage restoration. An inlay is an indirect restoration that fits within the cusps of a prepared tooth. The number of surfaces involved determines the specific code used for billing.
Billing Guide
Bill this code when:
- A re-cement or re-bond inlay, onlay, veneer or partial coverage restoration is fabricated and cemented on the prepared tooth
- The number of surfaces matches the code description
- The material type matches the code specification
Do not bill this code when:
- The surface count or material does not match this code
- A direct restoration was placed instead of an indirect restoration
- The restoration was placed on an implant abutment. Use the appropriate D6xxx code
- The procedure is better described by D2915 (Re-cement or re-bond cast or prefabricated post an...)
Insurance and Denial Prevention
Key Payer Rules:
- Most plans cover restorative procedures at 50-80% depending on the specific service
- Downgrades may apply (e.g., porcelain crown downgraded to base metal on posterior teeth)
- Waiting periods often apply for major restorative services on new plans
- Some plans require prior authorization for crowns and indirect restorations
Common Denials and How to Respond:
- Material downgrade - The payer covers an alternate material at a lower fee. Bill the actual code and let the patient know about the potential balance.
- Waiting period not met - Verify the patient's plan effective date and any waiting periods for major services.
- Tooth not restorable - Submit radiographs and clinical documentation showing the tooth can be successfully restored.
Claim Submission Checklist
0/4 completeFrequently Asked Questions
Keep This Handy
Save this D2910 reference for quick access during billing.
Explore Related Codes
Codes commonly billed alongside or often confused with this procedure.
Re-cement or Re-bond Cast or Prefabricated Post and Core
Covers re-cement or re-bond cast or prefabricated post and core as part of a complex restorative buildup.
Re-cement or Re-bond Crown
Re-attaching a crown that has come loose or fallen off the prepared tooth.
Reattachment of Tooth Fragment, Incisal Edge or Cusp
A restorative procedure covering reattachment of tooth fragment, incisal edge or cusp.
Prefabricated Porcelain/ceramic Crown - Permanent Tooth
Covers the fabrication and placement of a prefabricated porcelain/ceramic crown - permanent tooth to restore a damaged or compromised tooth.